Septic permits near Dallas-Fort Worth: Collin, Denton, Rockwall, Tarrant, Dallas
Around Dallas-Fort Worth, each county runs its own septic permit program outside most city limits, and several cities and a water district run their own. Collin, Rockwall and Tarrant counties set minimum lot sizes of one acre or more, and all five publish rules for aerobic systems. [1] [2] [3] [4] [5] [6]
Last checked · sources below · about this page · Markdown version
Not legal advice. This page reports what each county publishes; fees and rules change, so confirm with the county before you apply.
The five counties side by side
| County | Who issues permits | Published fee for a house | Minimum lot size | Aerobic systems | Source |
|---|---|---|---|---|---|
| Collin | Collin County Development Services, unless your city is listed as its own authorized agent | No fee listed on the county page | 1 acre (1.5 with a well) for lots divided 1983-2008; 1 usable acre (1.5 with a well) since 2008 | Three forms when the property is sold | [1] |
| Denton | Denton County Public Health, Environmental Health Division (unincorporated county) | $310 for a system; $100 for repairs or other changes | Not stated in the county handout | Contract on file 30 days before the old one expires, or approved homeowner training | [7], [5] |
| Rockwall | Rockwall County Environmental Health Coordinator | No fee listed on the county page | 1.5 acres per dwelling | Maintenance contract required | [8], [3] |
| Tarrant | Tarrant County for 23 cities and the unincorporated county; some cities and a water district run their own programs | No fee listed on the county page | 1 acre, net of easements, for single-family subdivisions (Nov. 2025 order) | Spray disposal needs a disinfection stage and an ongoing maintenance contract | [6], [2] |
| Dallas | Dallas County Health and Human Services, Environmental Division | $260 | Not stated on the application | Spray systems need a maintenance contract and a recorded affidavit | [9], [4] |
- How many permits each county issued in 2025
-
As TCEQ's authorized agent in 2025, Collin County issued 620 septic permits (authorizations to construct), 428 of them for surface (spray) irrigation; Denton 325 (293 spray); Tarrant 273 (184); Dallas 80 (61); Rockwall 51 (47). Cities and other agencies inside these counties report separately. [10]
Collin County
- Where to apply
-
Outside city limits, apply through Collin County's Citizen Self-Service portal. Inside a city you may still have to apply to the county: the county says to check TCEQ's list of authorized agents for Collin, and if your city isn't listed, Collin County is your authorized agent. [1]
- Stricter county rules
-
A county court order (CO No. 2008-187-03-11) adds requirements beyond the state rules. Where the county is the permitting authority, adding a structure or pool, or altering a structure, on a property with a septic system needs a "review of existing OSSF for new construction/improvement" permit. [1]
- Minimum lot size
-
Lots divided between 1983 and 2008 must start with at least 1 acre, or 1.5 acres with a water well. Lots divided in 2008 or later need 1 usable acre, or 1.5 acres with 1 usable acre if there is a well. "Usable" excludes most easements, ponds and similar areas. [1]
- Permits expire
-
After 365 days with no activity, counted from the date of issue. [1]
- Buying a home with an aerobic system
-
Collin County requires three forms: a Change of Ownership form, an Aerobic Wastewater Homeowner's Information sheet, and a maintenance contract in the new owner's name from a licensed maintenance provider, all submitted through its OSSF Report Portal. [1]
Denton County
- Who issues permits
-
The Environmental Health Division of Denton County Public Health, in the unincorporated parts of the county. A permit is needed to install, repair, extend or alter a system "in any manner". [7] [5]
- Published fees
-
$310 to build a system and $100 for repairs or other modifications, paid when you apply and not refundable. The county handout was revised September 14, 2020. [5]
- What a permit needs
-
The county lists:
- A floodplain development permit or culvert permit from the county planning department, when required
- A completed Denton County application, submitted in person
- Design criteria showing a system can actually be installed and will meet county and TCEQ rules
- A site evaluation by a licensed professional engineer or a licensed Site Evaluator who holds a Registered Sanitarian license
- A valid maintenance contract and recorded affidavits, when required
- Final inspection
-
The county does the final inspection; call at least 2 days ahead. The owner then gets a Notice of Approval, which must be in hand before the system is used. [5]
- Aerobic systems
-
Owners must keep a signed contract with a valid maintenance company and file a copy at least 30 days before the previous contract expires, or have the county's written approval of homeowner training. [5]
Rockwall County
- Who issues permits
-
The Rockwall County Environmental Health Coordinator handles septic permits and inspections and publishes an OSSF permit application, an OSSF affidavit and a Change of Ownership form. Office: 1101 E. Yellowjacket Lane, Suite 130, Rockwall; 972-204-7600. [8]
- Contracts and lot size
-
Rockwall County requires maintenance contracts for all systems using aerobic treatment, and requires 1 1/2 acres per dwelling for a septic system. [3]
Tarrant County
- Who issues permits
-
Tarrant County runs septic inspections and permits for 23 cities and the unincorporated parts of the county. For questions the county lists 817-212-7082. [6]
- Other agencies in the county
-
The county's FAQ names the others: the Tarrant Water Improvement District (only within 2,000 feet of Eagle Mountain Lake), the City of Arlington, the City of Burleson, the City of Fort Worth, and Fort Worth Lake Management in some areas around Lake Worth. TCEQ's 2025 report lists the water district as Tarrant Regional Water District, and also lists the City of Reno and the Town of Flower Mound under Tarrant County. Check OARS for your address. [2] [10] [11]
- Minimum lot size
-
On November 11, 2025, the Commissioners Court adopted Court Order 146317: lots in single-family subdivisions must be at least one acre, net of drainage and floodplain easements. The county adds that nearly all of its unincorporated land is in a city's extraterritorial jurisdiction (an area outside city limits where the city can set subdivision rules). [6]
- Spray (surface) disposal
-
The FAQ says treated effluent can go on the surface only with an approved aerobic unit and a disinfection stage, a design made for that purpose, and an ongoing maintenance contract with periodic testing. [2]
- Who can install
-
A state-licensed installer, or a homeowner for a single-family residence. Multi-family, rental and nonresidential property need a licensed installer. [2]
Dallas County
- Who issues permits
-
Dallas County Health and Human Services' Environmental Health Division reviews designs, issues permits with the authorization to construct, and inspects installations. The application lists (214) 819-2112. [9] [4]
- What an application needs
-
The county form lists:
- A signed statement from Dallas County Public Works or a city official that the property is not in the 100-year floodplain; all buildings and the system must be out of it
- A site evaluation by a TCEQ-licensed Site Evaluator
- A plat or survey
- A design by a registered sanitarian or registered professional engineer
- For a spray system: a valid maintenance contract and a recorded affidavit filed against the property deed
- For an evapotranspiration (ET) drain field: a recorded affidavit stating the flow rate
- Fee and review time
-
$260 for a residence and $310 for commercial, paid by exact cash, check or money order. Allow at least 30 working days for review. The form is marked revised December 1, 2020. [4]
About this page
What five Dallas-Fort Worth counties publish about septic permits: who issues them, what an application needs, published fees, minimum lot sizes, and what each requires for aerobic systems and home sales.
- Key facts
- Covers
- Which office issues septic permits in each county
- Which other agencies issue permits in Tarrant County
- What each county's application asks for
- Published permit fees
- Minimum lot sizes
- Aerobic maintenance contract and change-of-ownership rules
- How many 2025 permits each county issued
- Not covered
- Permits issued by cities inside these counties
- Statewide rules in detail (see the Texas permit rules page)
- Jurisdiction
- Collin, Denton, Rockwall, Tarrant and Dallas counties, Texas, where each county is the permitting authority (mostly unincorporated areas). Cities and other agencies issue permits in parts of these counties.
- Audience
- Homeowners, buyers and landowners in the Dallas-Fort Worth area with, or planning, a septic system (on-site sewage facility, OSSF).
- Provides
- A county-by-county comparison table
- Each county's published requirements, with links to the county page
- County contact details as published
- Content last changed
- Last verified
- Primary sources
- Collin County Development Services: On-Site Sewage Facilities [1]
- Tarrant County Engineering Services, Environmental Division: On-Site Sewage Facilities: Frequently Asked Questions [2]; On-Site Sewage Facilities [6]
- Rockwall County: Frequently Asked Questions (Environmental Health Coordinator) [3]; Environmental Health Coordinator [8]
- Dallas County Health and Human Services, Environmental Division: Application: On-Site Sewage Facility Permit (OSSF) [4]
- Denton County Public Health: What You Must Know: On-Site Sewage Facilities (OSSF) [5]; Environmental Health Division [7]
- Dallas County Health and Human Services: Environmental Health Division [9]
- Texas Commission on Environmental Quality (TCEQ): Types of Systems Installed by Time Period, 1/1/2025 to 12/31/2025 [10]; OARS: Find a Local Contact (septic permitting authority by county) [11]
- Texas Administrative Code, via Cornell Legal Information Institute: 30 Tex. Admin. Code § 285.2, Definitions [12]
- Other formats
- Markdown version
Contacts
Collin County Development Services
- What they handle
- Septic permits where Collin County is the authorized agent
- Area
- Collin County
- Phone
- (972) 548-5585
Denton County Public Health, Environmental Health Division
- What they handle
- Septic permits and final inspections in unincorporated Denton County
- Area
- Unincorporated Denton County
- Phone
- 940-349-2920
Rockwall County Environmental Health Coordinator
- What they handle
- Septic permits and inspections
- Area
- Rockwall County
- Phone
- 972-204-7600
- Source
- [8] Rockwall County
Tarrant County Environmental Division
- What they handle
- Septic questions for the county's 23 contract cities and unincorporated areas
- Area
- Tarrant County
- Phone
- 817-212-7082
Dallas County Health and Human Services, Environmental Division
- What they handle
- Septic permits and inspections
- Area
- Dallas County
- Phone
- (214) 819-2112
Sources
Each fact above cites one or more of these by number. Accessed is the date the source was last re-read.
- [1] On-Site Sewage Facilities. Collin County Development Services. Primary source.
Supports: Collin application portal, authorized agent rule, court order, review permit, lot sizes, permit expiry, three forms at sale, phone.
Accessed: . - [2] On-Site Sewage Facilities: Frequently Asked Questions. Tarrant County Engineering Services, Environmental Division. Primary source.
Supports: Tarrant's list of authorized entities, surface disposal conditions, who can install.
Accessed: . - [3] Frequently Asked Questions (Environmental Health Coordinator). Rockwall County. Primary source.
Supports: Rockwall requires aerobic maintenance contracts and 1 1/2 acres per dwelling.
Accessed: . - [4] Application: On-Site Sewage Facility Permit (OSSF). Dallas County Health and Human Services, Environmental Division. Primary source.
Supports: Dallas application items, spray and ET affidavits, fees, 30 working days, phone.
Publisher's date: Form marked revised 2020-12-01 (file name says July 2025).
Accessed: . - [5] What You Must Know: On-Site Sewage Facilities (OSSF). Denton County Public Health. Primary source.
Supports: Denton permit scope, fees, requirements, final inspection, aerobic contract filing.
Publisher's date: Handout revised 2020-09-14.
Accessed: . - [6] On-Site Sewage Facilities. Tarrant County Engineering Services, Environmental Division. Primary source.
Supports: Tarrant coverage of 23 cities, Court Order 146317 lot size, ETJ note, phone.
Publisher's date: Page last modified 2026-04-06.
Accessed: . - [7] Environmental Health Division. Denton County Public Health. Primary source.
Supports: Denton Environmental Health Division role and phone.
Accessed: . - [8] Environmental Health Coordinator. Rockwall County. Primary source.
Supports: Rockwall duties, forms, address and phone.
Accessed: . - [9] Environmental Health Division. Dallas County Health and Human Services. Primary source.
Supports: Dallas Environmental Health Division reviews designs, issues permits and inspects.
Accessed: . - [10] Types of Systems Installed by Time Period, 1/1/2025 to 12/31/2025. Texas Commission on Environmental Quality (TCEQ). Primary source.
Supports: 2025 permit and surface irrigation counts by county; authorized agents listed under Tarrant County.
Publisher's date: Report dated 2026-04-27.
Accessed: . - [11] OARS: Find a Local Contact (septic permitting authority by county). Texas Commission on Environmental Quality (TCEQ). Primary source.
Supports: Authorized agents by county.
Accessed: . - [12] 30 Tex. Admin. Code § 285.2, Definitions. Texas Administrative Code, via Cornell Legal Information Institute. Primary source.
Supports: Definition of authorized agent.
Accessed: .
Page history
- : First version of this page.